The new merchandise consist of a series of substantial-tech and substantial quality chains and sprockets and gears, these kinds of as chains and gearboxes for agricultural machineries, metallurgical chains, escalator step-chains, higher-velocity tooth chains, timing chains, self-lubrication chains, between which have kind higher pace tooth chain for auto branch dynamic box and aerial chains fill in the blanks of chain in China. we provide chromed bar and tubes for hydualic and pheumatic cylinders. we have obtained the have confidence in of buyers globally. Fall solid swivel couple
Overview
Fast Information
Place of Origin:EPTT Brand name Identify:EPTT. Scaffolding Coupler
Model Amount:DC002 Scaffolding Coupler thickness:5mm
area remedy:galvanized substance:Q235 steel
quality certification:SGS Measurement:48.3*forty eight.3mm
application:for connecting the scaffolding pipe certification:SGS
manufacturer name:EPTT. in EPTgEPT model coupler EPTT:in woven EPTT
Kind:Scaffolding Elements
EPT Ability
10000 Piece/Pieces per Thirty day period
EPTT amp Shipping
EPTT Particulars
Scaffolding double coupler is in bag or steel pallet paking ,or as for every customer’s want
Port
TianEPTTg port,
EPT Time
EPTtity(Items) | ge5000 | 15days |
Est. Time(days) | ge10000 | To be negotiated |
Specification
EPT: Q235
Measurement:forty eight.3mm*forty eight.3mm,forty eight.3mm*sixty.3mm
Floor complete: electro galvanized, EPTTG, Painted
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd: BS1139, EN74,
Varieties: pressed scaffolding coupler, solid scaffolding coupler, and casting scaffolding coupler
EPTT: Woven luggage, pallets, bundles or as consumer JCEP.
Item |
Product Identify |
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd |
Manufacturing Type |
Thickness |
Outer Diameter |
U.W |
EPTtity |
one |
EPTT Coupler |
British |
Pressed |
four.75mm |
48.3mm |
.82 |
25000 |
2 |
Swivel Coupler |
British |
Pressed |
4.5*four.75mm |
48.3mm |
one.015 |
23500 |
three |
Sleeve Coupler |
British |
Pressed |
3.5mm |
48.3mm |
1 |
2571 |
4 |
Inner EPTt Pin |
British |
Pressed |
four.5mm |
forty eight.3mm |
.seven |
35000 |
five |
50 percent Coupler |
British |
Pressed |
four.75mm |
48.3mm |
.five |
49000 |
six |
Board ReXiHu (West EPT) Dis.Hu (West EPT) Dis. |
British |
Pressed |
4.75mm |
forty eight.3mm |
.fifty six |
35000 |
7 |
Putlog Coupler |
British |
Pressed |
4.75mm |
48.3mm |
.57 |
35000 |
eight |
EPTT Coupler |
British |
Drop Solid |
48.3mm |
one. |
24000 |
|
nine |
Swivel Coupler |
British |
Fall Solid |
forty eight.3mm |
one.twelve |
21000 |
|
10 |
Sleeve Coupler |
British |
Drop Cast |
three.5mm |
48.3mm |
one. |
21000 |
eleven |
Inner EPTt Pin |
British |
Drop Cast |
forty eight.3mm |
one.05 |
24000 |
|
12 |
Board ReXiHu (West EPT) Dis.Hu (West EPT) Dis. Coupler |
British |
Drop Forged |
4.75mm |
forty eight.3mm |
.sixty one |
35000 |
thirteen |
GirEPTTCoupler |
British |
Fall Forged |
11.5mm |
forty eight.3mm |
one.6 |
15000 |
14 |
Putlog Coupler |
British |
Drop Forged |
four.75mm |
48.3mm |
.sixty one |
35000 |
fifteen |
EPTT Coupler |
Korea(90 deg) |
Pressed |
3mm |
forty eight.6mm |
.sixty seven |
36000 |
sixteen |
Swivel Coupler |
Korea(90 deg) |
Pressed |
3mm |
48.6mm |
.65 |
36000 |
17 |
EPTT Coupler |
JIS(one hundred ten deg) |
Pressed |
3mm |
48.6mm |
.67 |
36000 |
eighteen |
Swivel Coupler |
JIS(110 deg) |
Pressed |
3mm |
48.6mm |
.65 |
36000 |
19 |
Internal EPTt Pin |
JIS |
Pressed |
3mm |
forty eight.6mm |
.sixty seven |
36000 |
twenty |
EPTT Coupler |
German |
Fall Solid |
forty eight.3mm |
one.25 |
/ |
|
21 |
Swivel Coupler |
German |
Fall Solid |
48.3mm |
1.forty five |
Scaffolding Couplers for 48.3mm EPT JCEPs JIS Pressed Swivel Coupler double couple
1.This sort of scaffold coupler is Pressed which can guarantee a very good form and precision measurement. 2.Pressed scaffold coupler is made of Q235 metal which is a sort of high high quality steel 3. The surface area of this scaffold coupler has a EPTT existence span. four. This Pressed scaffold coupler has stationary angle to fix the steel tube scaffolding at rigEPTT angle
five. We can give diverse size and types of fall solid scaffold coupler and pressed scaffold couplers.
Operate of the Scaffold Coupler
one.Fixed Scaffold Coupler is employed to join the metal pipe at ninety diploma.
two.Swivel Scaffold Coupler is utilised to join the steel pipe at 360 diploma.
three.Sleeve Scaffold Coupler is used to hook up the steel pipe at 180 diploma.
our factory
global certificates
our buyers from all of the planet
EPTT AND Transport
EPTT has been estabEPTTd in HangEPT,EPTT.
We offer companies with content of substantial stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd undisputed quality providers with aggressive costs.and we
supply comprehensive remedies of scaffolding and formwork system to the design industry.Our varied items
mix of Ringlock technique,Body program,Steel plank,
Steel prop,Scaffolding pipe and all variety of couplers with high quality for business and EPTT design
EPTT.
A lot of of our client foundation are returning consumers whom we have identified and worked for a lot of a long time.
Our items have enEPTTed fantastic well-known at property and abroad,
Such as The united states,Australia,Europe,the Middle EPT and so on
FAQ
one. Concern: What is actually your MOQ(least orEPTTquantity)?
Response: One particular total container.
two. Concern: What is your EPTT techniques?
Solution: Packed into bundle, and relaxation in bulk.
three. Question: What is your payment terms?
Solution: T/T thirty% in EPT amp T/T 70% on sending the copy of Monthly bill of Lading, L/ C 100%, or negotiate
in accordance to the orEPTTstatus
4. Issue: What is actually your shipping and delivery time?
Answer: 10-20 daEPTTafter EPTd the EPT payment or L/C.
5. Concern: Are you company or trader?
Response: We are the munafacturer of SCAFFOLDINGS Supplies for ten years several years. Our team business
has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
six. Issue: Where’s your manufacturing unit?
Response: Our manufacturing facility is in TianEPTT city (near BeiEPTTg) and EPTTyu city, ZheJCEP Province, afforded sufficient generation
ability and before supply time.
seven. Issue: Can we visit your manufacturing facility?
Response: Warmly welcome. After we have your schedule, we will organize the skilled income crew to adhere to
up your situation.
eight. Concern: Can you supply other scaffolding supplies?
Answer: Sure. All connected scaffolding resources.
(one) scaffolding program (cup-lock method, ring lock program, frame, pipe ampcoupler technique)
(2) scaffolding pipes (1.5′-2.0′)x(.three-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW EPT, Sqaure/ Rectangular tube GB/T6728)
(four) steel coupler (preesed / fall solid coupler)
(five) steel plank with hooks or with no hooks
(6) metal stair circumstance