we supply chromed bar and tubes for hydualic and pheumatic cylinders. We are hunting forward to establishing profitable enterprise interactions with new clients about the world in the foreseeable future. The merchandise well displays environmental protection and strength conserving.
AMD-P System CNC Turret Punch EPTT
one. EPTT laptop numerical handle technique, EPTT organization deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment numerical control processing software program, can obtain the discipline programming, backstage programming 19 inch brand Liquid crystal display keep track of, the picture is more obvious and stunning Application convenient operation, provide their very own mould library management, can identify CAD drawings routinely generate CNC code, and realize the computerized programming, computerized feeding, automatic stamping, substantial speed, higher accuracy.
two. Adopts our business unbiased investigation and deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment the in-line arrangement die-set, can recognize the automated modifying mould, match the internationally employed stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd mould and effortless to change.
3. Servo motor, linear XiHu (West EPT) Dis.Hu (West EPT) Dis. rail, ball screw, coupling and pneumatic elements and EPT elements have been EPTTed manufacturer. To ensure the EPTTs’ accuracy and security
four. Use centralized lubricating method, computerized return oil, ball screw , XiHu (West EPT) Dis.Hu (West EPT) Dis. and other significant EPTT areas are f centralized lubrication, proEPTT the EPTTs’ support lifestyle.
Specification | Unit | AMD-P10 | AMD-P20 | AMD-P25 | AMD-P30 | AMD-P35 |
Punch Power | KN | In accordance to the pressing drive JCEP to approach the sheet | ||||
Processing sheet thickness | mm | le6 | ||||
Processing sheet measurement |
mm | one thousand*a thousand | 1000*2000 | 1250*2500 | 3500*1250 | 3500*1250 |
Punching Frequency |
hpm | 150 | ||||
Sheet Moving speed | m/min | forty | ||||
Gap Accuracy | mm | plusmn0.1 | plusmn0.one | plusmn0.one | plusmn0.one | plusmn0.1 |
Voltage Rating | V | 380 plusmn5% | 380 plusmn5% | 380 plusmn5% | 380 plusmn5% | 380 plusmn5% |
Prower Rating |
KW | 2 | 3 | three.five | four | four.five |
EPTT Excess weight |
T | three.3 | four.2 | five | five.8 | six.two |
Edge:
one. Labor-conserving: operate and feed feeding automatically , automatic estimate time.
two. Computing time-saving: understand the conversion approach about the CAD graph routinely.
3. Positioning time conserving: pneumatic gripping,EPTTful,no line deflection.
four. Replacing moulds time preserving: utilizing the configuration of practical replacing moulds.
5. Increase productivity: in comparison with typical punching EPTT,the CNC punching EPTT with 95-100min Stamping frequency which enhance the performance.
6. Improve the ratio of security: the EPTT performs instantly, which can put an conclude to basic safety accidents.
one | Reply your inquiry in 8 working several hours. |
two | Knowledgeable staffs solution all your questions in time. |
three | EPTT layout is obtainable. |
four | Unique and EPT solution can be presented to our consumer by our specialist engineers and staff. |
5 | EPT discount and safety of revenue are supplied to our distributor. |
6 | We are skilled manufacturer of CNC Punching EPTT. Have a professional design crew with a lot more than ten many years design encounter engineers, aggressive with excellent high quality |
seven | As an honest vendor, we often use superior raw materials, EPTd EPTTs, skilled experts to make certain our goods to be finished in higher high quality and steady characteristic. |
eight | Prompt supply, website set up and commissioning. |
EPT Information:
MOQ: 1set.
Settlement Currency: USD, RMB, EUR.
EPT method: FOB (FCA), CIP, CFR, CIF, DDU, DDP, Turnkey.
Payment expression: 30% deposit by T/T, the balance paid before shipping or L/C at sight.
Shipping time: Inside fifteen-40 daEPTTaccording to different kind EPT metal stamping press EPTT.
After-sale provider:
one. Set up and commissioning situation of CNC punching EPTT: We will deliver 1-2 professionals to support with EPTT set up and commissioning, consumer paEPTTfor their tickets, resort and diet plan. Buyer need get ready installation EPTTry and instruments.
2. Guarantee time:12 months from date of commissioning completion, but no much more than eighteen months from day of delivery.
3. EPT complete english files: incXiHu (West EPT) Dis.Hu (West EPT) Dis. EPTT installation drawings, pit design and style drawings, guide book, electric wiring diagram, electric powered manual book and routine maintenance book, etc.
Any query pls speak to with us and welcome to pay a visit to our manufacturing unit.